A mighty crew of eight of us at Breaks Fold Farm; Andy, Barry, Dave, Duncan, Rob, Simon, Wayne and Graham. A pleasant but warm morning with the sight of heather in the distance and the occasional flock of geese and the odd kite flying above. Unusually there was a steady stream of aircraft flying into Leeds/Bradford, obviously a factor of the wind direction. Up to lunchtime good progress was made, but during the break someone switched the heater on and by 14.30 any energy had been sapped away.
From the off, Barry and Graham detached themselves and worked on the next stretch. For a good length, the wall was in relatively good condition so only toppers and a course were removed to lower the wall to match what the rest of the team were working on. They then set about dismantling a three yard stretch which needed a rebuild. By lunchtime the wall had been cleared and half the foundations added. The afternoon was another story. Barry completed his foundations and a single course was added, very little progress compared with morning.
The rest of the team continued on from last week, adding something like four courses over the 15 yard section; a lot of wall in the conditions.
End of day on the main section
Simon, Andy and Wayne doing a final inspection
Barry and Graham's progress at lunchtime
The energy sapping progress , or lack of it, in the afternoon