Markenfield Hall, Ripon - Park Pale southern wall

Image
  Seven of us this week; Andy, Dave, Duncan, Rob, Rod, Simon and Graham. Andy and Graham spent the morning completing a final couple of courses and topping out the last five yard section at the start of the wall. The wall we started to rebuild in October 2011 is now complete, all 420 metres of it;  a completion ceremony beckons at some date in the future.  Across the gateway from "our" wall, there is another wall which had been rebuilt shortly before 2011.  This has collapsed in places, most probably due to the nature of the ground and passing heavy agricultural machinery.  As we don't have another significant winter job to do, we decided to tackle a refurbishment of this wall until such time that we can move to other suitable sites.  For the sake of the blog , I am calling this the Southern Wall.    Dave, Duncan, Simon, Rob and Rod had dived into the task of dismantling a five metre section and by lunchtime had  started the rebuild.  Wh...

Markenfield Hall, Ripon completion of 14 years work

Image
 (No walling previous week - rained off) A bitterly cold day at Markenfield with an icy east/southerly(?) blowing both sides of the wall. Andy and Graham continued  the rebuild of the southern end of the wall, dismantling another three yards before starting to build again. Towards the end of the day, the rest of the group came to lend a helping hand.  A morning's work next week will see its completion. At the northern end of the wall,  Rob, Dave, and Simon completed the wall end, topping out just after lunch, and having tidied the area came to help Graham and Andy.  This end of the wall is a solid and fine piece of walling, not necessarily conventional but fine all the same.                                                             Start of the day at the southern end of the wall ...

Markenfield Hall, Ripon

Image
After a very cold and damp Tuesday, we were concerned as to what the weather would deliver on Wednesday. It so happened that we had another good day for walling. It had stopped raining by the time we arrived and although very dull and grey the rain did not reappear and the temperature was OK for busy wallers.  Graham and Andy worked on the repair of the original cheekend and completed that by lunchtime. After lunch, they started on another section which had been weakened by the tree and movement of the wall end. By the end of the day an 8 foot section had been taken down and foundations reinstated. Dave, Simon, Duncan and Rod tackled the wall to and around the field corner. Dave and Simon demolished the wall beyond the corner then reassembled stepping up the end to leave both a way around the wall and potential to extend the repair. Meanwhile Duncan and Rod took the wall down further to foundation level on the main wall length before similarly rebuilding. Several of the cornerstone...