Posts

Showing posts from May, 2026

Washburn Heritage Centre car park, 27 May 2026

Image
Six of us Barry, Andy H, Andy M, Dave, Rod and Graham enjoyed another warm, but not too hot day in very pleasant surroundings.  We last did a major job at the Washburn Heritage Centre car park in August 2017. Today we completed another two week stint, rebuilding the western wall of the car park, some twenty five yards or so, plus a three yard extension next to the footpath.                                                            Three metre extension                                                               Twenty five yard rebuild

Washburn Heritage Centre car park, 20 May 2026

Image
T he original request to repair cheek ends damaged by delivery vehicles, plus a short extension at the other side of the car park, blossomed into a commitment to repair the whole length of the north-west perimeter wall of the car park. A day of breezy showers forecast, however, the sheltered location gave us mainly dry and mild conditions with jackets discarded for the exertions of digging out the bank for a better alignment plus the removal of dumped grit behind the wall. Some useful stone recovered, but that of the dismantled wall mostly shallow and dictating a modest height in the reconstruction. Good progress made with a strong team of 7: Andy, Rod, Duncan, Simon, Graham & Barry plus new recruit Andy who brings recent DSWA experience & revived skills from teenage school holidays working alongside his professional waller grandfather. Welcome Andy! Liz delivered two trailer loads of additional stone for the extension aided by Rod & Duncan. Exotic pork pies at lunch from A...

Day Ash, Day Lane, Thornthwaite

Image
  A chilly start to the day at Day Ash but by lunchtime we were able to sit and bask in the sun.  This was our fourth and final week at the site and in total we had rebuilt some 27 yards (or possibly metres) of wall ( imagine a stretched cricket pitch!). Initially Simon and Rob tackled the shorter section while Andy, Barry and  Graham, with more to do, worked on the longer section. Later in the day Graham moved along to join Simon and Rob as toppers were added.  This job started with three short sections to repair; as usual once we get going we always manage to increase the spec!  Just before coffee break Graham had gone to our next job at the Washburn Heritage Centre car park to meet Steve, who was installing some posts, to protect the wall we were about to rebuild.  Having completed the tidy up at Day Ash we all then went there to scope the task in two weeks time.                       ...