Washburn Heritage Centre car park, 20 May 2026

The original request to repair cheek ends damaged by delivery vehicles, plus a short extension at the other side of the car park, blossomed into a commitment to repair the whole length of the north-west perimeter wall of the car park. A day of breezy showers forecast, however, the sheltered location gave us mainly dry and mild conditions with jackets discarded for the exertions of digging out the bank for a better alignment plus the removal of dumped grit behind the wall. Some useful stone recovered, but that of the dismantled wall mostly shallow and dictating a modest height in the reconstruction. Good progress made with a strong team of 7: Andy, Rod, Duncan, Simon, Graham & Barry plus new recruit Andy who brings recent DSWA experience & revived skills from teenage school holidays working alongside his professional waller grandfather. Welcome Andy!

Liz delivered two trailer loads of additional stone for the extension aided by Rod & Duncan. Exotic pork pies at lunch from Andy H. nourished us for the afternoon’s labours.


                                                The original wall

                                                                     Close of play 1

                                            Close of play 2

                                                Close 3

                                                Close 4

                                                 A bit of tidying up around the post

Comments

Popular posts from this blog

Red Sike, Hookstone Memorial Hall, Thornthwaite

Low Waite Farm 7 October 2026

Low Waite Farm 4 November 2026