Day Ash, Day Lane, Thornthwaite
A pleasantly warm and sunny start to the day as we gathered on Day Lane at Thornthwaite, daffodils still in bloom and the adjacent copse alive with birdsong. The removal of ivy revealed a wall in a poor state and we needed to take down the whole stint to renew the foundations. Andy, Duncan, Dave, Simon, Rob & Barry soon had the stones laid out, some of which were quite substantial, and the larger of these provided a sound base on which to build. With limited space on the wall, Barry spent the rest of the morning clearing the nearby stile of thorns and ivy, and setting a lower step on the far side to ease the descent. A couple with binoculars called by on their way to monitor nesting curlews, and a local resident walking her dog were the only visitors. Good progress was made on the rebuild and the wall was topped off, and the site cleared by 2pm before the threatening rain appeared.
The three small gaps on the roadside wall up the lane were left for another day.
Vegetation clearance
Dave & Simon remove the remains of a tree stump
Ready for rebuilding
Foundation stones in place
Restored wall at end of play
From the other side
Stile made safer
Comments
Post a Comment