Markenfield Hall, Ripon
After a very cold and damp Tuesday, we were concerned as to what the weather would deliver on Wednesday. It so happened that we had another good day for walling. It had stopped raining by the time we arrived and although very dull and grey the rain did not reappear and the temperature was OK for busy wallers. Graham and Andy worked on the repair of the original cheekend and completed that by lunchtime. After lunch, they started on another section which had been weakened by the tree and movement of the wall end. By the end of the day an 8 foot section had been taken down and foundations reinstated.
Dave, Simon, Duncan and Rod tackled the wall to and around the field corner. Dave and Simon demolished the wall beyond the corner then reassembled stepping up the end to leave both a way around the wall and potential to extend the repair.
Meanwhile Duncan and Rod took the wall down further to foundation level on the main wall length before similarly rebuilding. Several of the cornerstones required all four of us to lift into place! Reworked cheek end at the start of the wall; we started there in October 2011
From another angle
Camera angle doesn't do justice to the rebuild?
Thoughtful Andy, looks at the next section
By close of play, wall dismantled and foundations reinstated
Our version of a sheep proof fence
Wall's End, very solid looking
Simon places stones with precision
Duncan checks Dave and Simon's efforts







Comments
Post a Comment